second soil excavation and removal cleanup conducted in 2017 to address residual TPH impacts.. These interim actions address different contaminants in different (not co-located) areas from two separate releases. These areas are referred to as the Riverside TPH Site and the Riverside HVOC Site. This FS is for the TPH site only.